Loja Energy

The Loja Energy Project boasts a 1.12 MWp solar capacity, completed within a 10-month timeframe. The installation was carefully designed to adapt to the region’s climatic and topographical conditions, ensuring efficient and stable operation.

The solar plant meets the region’s growing energy demands by providing a renewable energy solution that respects the surrounding environment. This system strengthens access to clean energy in Loja, delivering lasting value to the local community.

  • LocationLoja, Ecuador
  • TechnologySolar 1.12 MWp
    BESS (Li-ion) -
    Followers-
  • Duration10 months
  • ChallengesAdverse weather conditions during installation
    Terrain-specific complexities during assembly

Pre-Solartia Situation

The region relied primarily on hydroelectric power, but limitations in generation capacity and frequent power outages disrupted both households and small businesses.

In many rural areas, reliance on diesel generators increased costs and caused significant environmental impacts. The absence of adequate infrastructure and renewable energy policies prevented the region from achieving stable and sustainable development.

Loja: A Hub of Culture, History, and Nature

Located in southern Ecuador, Loja is celebrated for its cultural heritage, historical significance, and natural beauty. The local economy has traditionally relied on agriculture and trade, with notable production of coffee, sugarcane, and fruits.

In recent decades, the city has experienced significant growth in tourism activity, driven by its proximity to protected natural areas like the Podocarpus National Park. This tourism boom has led to a higher demand for services and a steadily increasing energy consumption.

View location on google maps

Our priority

Sustainability with a Global Impact

We are committed to building a sustainable future, combining innovation and sustainability to tackle the world’s greatest challenges. Join the transformation!

Contact us

Projects of Solar PV Plants

Centrovía Project – Zaragoza
Arbanta Project
Valdegón Project

Ready to embrace the vision

green? Contact us!

Together we can contribute to a more sustainable, more responsible, more humane and greener world.

Let us be your ally in this much-needed change.

"*" indicates required fields

We inform you that the data collected through this form is processed with your consent by Solartia, S.L.L., as the Data Controller, for the purpose of managing your request, responding to your inquiries, and preparing a proposal tailored to your needs. We use tools such as ActiveCampaign, located in the U.S., which adheres to the Privacy Shield protocol, exclusively for managing communications. You can withdraw your consent at any time and exercise your rights to access, rectify, delete, oppose, limit, or transfer your data by contacting us at info@solartia.com. You also have the right to file a complaint with the Spanish Data Protection Agency. For more information, please refer to our Privacy Policy.
Acceptance of privacy policy*
This field is for validation purposes and should be left unchanged.

Lastest news