Brus Laguna

Located in Brus Laguna, Honduras, the Perla Brus Laguna project delivers a 400 kWp solar energy system, 1.75 MWh of battery storage, and a 624 kW diesel backup. Developed in just 8 months, the project required multimodal logistics to overcome challenging access routes and involved continuous engagement with local ethnic communities to ensure respectful integration of the system.

Adverse weather conditions posed additional challenges during logistics and installation. However, the project is designed to provide a reliable energy supply in this remote region, aligning the benefits of storage technology with the community’s needs in a demanding environment.

  • LocationBrus Laguna, Honduras
  • TechnologySolar: 400 kWp
    BESS (Li-ion): 1.75 MWh
    Diesel Backup: 624 kW
  • Duration8 months
  • ChallengesComplex multimodal logistics for materials and personnel due to difficult access
    Project engagement with ethnic communities

Pre-Solartia Situation

Before the project, Brus Laguna, a remote community in Honduras located within the Río Plátano Biosphere Reserve, had no stable access to electricity and relied on precarious energy solutions. Around 40% of households used candles for lighting, while another 23.6% depended on limited private electricity, primarily from individual diesel generators.

This lack of reliable electricity negatively impacted daily life, restricted access to basic services, and limited the community’s ability to respond to emergencies and natural disasters

Location

Situated in northeastern Honduras in the Mosquitia region, Brus Laguna is known for its biodiversity, indigenous culture, and a landscape dominated by tropical rainforests and wetlands.

View the location on Google Maps

Solartia Hybrid Microgrid

Solartia builds a hybrid microgrid that integrates 400 kWp of solar PV + a 1,748 kWh energy storage system with batteries + a 624 kW diesel generator. Brus Laguna is a small indigenous village located in the jungle of La Mosquitia within the Biosphere of the Río Plátano, a territory declared a World Heritage Site by UNESCO, isolated from the electrical grid and lacking permanent access to affordable and clean energy.

Watts with Purpose

Hear the voices of those who collaborated with us on the Perla Project and those who will benefit from a more efficient and eco-friendly energy solution.

Watch us on YouTube 

Noemi Wood

Brus Laguna

Noemi Wood

Head of the “La Tía” soup kitchen

Pablo Ramírez García

Brus Laguna

Pablo Ramírez García

Resident and Collaborator Brus Laguna

Our priority

Sustainability with a Global Impact

We are committed to building a sustainable future, combining innovation and sustainability to tackle the world’s greatest challenges. Join the transformation!

Contact us

Projects of Energy Storage Systems

Perla Project – Brus Laguna
Perla Project – Guanaja (I)
Green Energy Island Project – Guanaja (II)

Ready to embrace the vision green? Contact us!

Together we can contribute to a more sustainable, more responsible, more humane and greener world.

Let us be your ally in this much-needed change.

Contact us

"*" indicates required fields

We inform you that the data collected through this form is processed with your consent by Solartia, S.L.L., as the Data Controller, for the purpose of managing your request, responding to your inquiries, and preparing a proposal tailored to your needs. We use tools such as ActiveCampaign, located in the U.S., which adheres to the Privacy Shield protocol, exclusively for managing communications. You can withdraw your consent at any time and exercise your rights to access, rectify, delete, oppose, limit, or transfer your data by contacting us at info@solartia.com. You also have the right to file a complaint with the Spanish Data Protection Agency. For more information, please refer to our Privacy Policy.
Acceptance of privacy policy*
This field is for validation purposes and should be left unchanged.

Lastest news