Perla Project – Brus Laguna
Electrifying rural areas to improve livelihoods

The Greytown project, located in San Juan del Norte, Nicaragua, features a 300 kWp solar capacity, combined with 600 kWh battery storage and a 280 kW diesel backup, delivering a stable energy source to a region with challenging access.
The installation was completed in 6 months, overcoming complex logistics and climatic challenges that made material transportation and personnel coordination difficult.
The implemented infrastructure ensures efficient energy management, optimizing local resources and reducing diesel dependence.
This project stands out for its adaptability to the geographical challenges of the area, enhancing energy resilience for the community of Greytown.

Before the installation of the photovoltaic solar plant, San Juan del Norte in Nicaragua’s Caribbean region faced limited and unreliable access to electricity. The region depended on diesel generators and the national grid, but frequent interruptions occurred due to hurricanes and poor infrastructure. Many rural communities lacked direct access to the grid, restricting their development.
The solar plant provided a key solution, improving energy stability and supporting sustainable growth in the region.
We worked in San Juan del Norte, also known as Greytown, a small and historic port situated at the mouth of the San Juan River on Nicaragua’s Caribbean coast. Its strategic location has played a significant role since colonial times, serving as a critical point for trade and navigation in the region.
Our priority
We are committed to building a sustainable future, combining innovation and sustainability to tackle the world’s greatest challenges. Join the transformation!
Together we can contribute to a more sustainable, more responsible, more humane and greener world.
Let us be your ally in this much-needed change.
Contact us
"*" indicates required fields