España
Centrovía Project – Zaragoza
Bringing clean energy to Zaragoza

Located in Navoi, Uzbekistan, this 100 MWp engineering project was completed in 24 months, with each phase of construction tailored to the topographical and climatic conditions of the terrain. The planning process addressed every technical aspect to ensure the stable and efficient integration of the infrastructure.
The solar plant represents a substantial contribution to the region’s renewable energy generation, maximizing the use of solar resources in a challenging environment. This project strengthens Uzbekistan’s energy infrastructure, promoting a shift toward more sustainable energy sources.
Navoi, located in the heart of Uzbekistan, is one of the country’s main industrial and mining centers and a significant hub for economic development in Central Asia.
Our priority
We are committed to building a sustainable future, combining innovation and sustainability to tackle the world’s greatest challenges. Join the transformation!
Together we can contribute to a more sustainable, more responsible, more humane and greener world.
Let us be your ally in this much-needed change.
Contact us
"*" indicates required fields