Projects

Europe

  • Date
    7 November, 2019
    LOCATION: Torres del Río, Navarra, Spain
    PEAK POWER: 5.5 MWp
    NOMINAL POWER: 4.5 MW
    TECHNOLOGY: Free-standing 2 angles

  • Date
    7 November, 2019
    LOCATION: Santacara, Navarra, Spain
    PEAK POWER: 27 MWp
    NOMINAL POWER: 20 MW
    TECHNOLOGY: Roof-mount
    PROPERTY: City Hall of Santacara
  • Date
    7 November, 2019
    LOCATION: Sartaguda, Navarra, Spain
    PEAK POWER: 0.9 MWp
    NOMINAL POWER: 0.7 MW
    TECHNOLOGY: Free-standing 2 angles

  • Projecto Burgas Project Solartia
    Date
    7 November, 2019
    LOCATION: Burgas, Bulgary
    PEAK POWER: 1.2 MWp
    NOMINAL POWER: 1 MW
    TECHNOLOGY: Free-standing 1 angle
    PROPERTY: Lukoil Neftochim Burgas refinery
  • Date
    7 November, 2019
    LOCATION: Viana, Navarra, Spain
    PEAK POWER: 8.7 MWp
    NOMINAL POWER: 8 MW
    TECHNOLOGY: Free-standing 2 angles
    PROPERTY: 226 owners
  • Date
    7 November, 2019
    LOCATION: Falces, Navarra, Spain
    PEAK POWER: 2MWp
    NOMINAL POWER: 1.59 MW
    TECHNOLOGY: 2-axis tracking, free-standing 1 angle

America


Asia

  • Proyecto Navoi Uzbequistan Project
    Date
    7 November, 2019
    LOCATION: Navoi, Uzbekistan
    PEAK POWER: 100 MWp
    SERVICES: Engineering
    PROPERTY: Lukoil Ecoenergy

CONTACT